欢迎来到寰标网! 客服QQ:772084082 加入会员
已选条件: 外部污水排放系统
每页显示20 条,共找到 2219 条结果 <1/111>
标准编号 标准名称 发布部门 发布日期 状态
ISO 10467:2018 Plastics piping systems for pressure and non-pressure drainage and sewerage - Glass-reinforced thermosetting plastics (GRP) systems based on unsaturated polyester (UP) resin Internatio.. 2018-05-17 现行
ASTM C1802-18a Standard Specification for Design, Testing, Manufacture, Selection, and Installation of Fabricated Metal Horizontal Access Hatches for Utility, Water, and Wastewater Structures American S.. 2018-05-15 现行
I.S. EN ISO 11297-1:2018 Plastics Piping Systems for Renovation of Underground Drainage and Sewerage Networks Under Pressure Part 1: General (iso 11297-1:2018) National S.. 2018-04-23 现行
I.S. EN 13476-1:2018 Plastics Piping Systems for Non-pressure Underground Drainage and Sewerage - Structured-wall Piping Systems of Unplasticized Poly (vinyl Chloride) (pvc-u), Polypropylene (pp) and Polyethylene (pe) Part 1: General Requirements and Performance Characteristics National S.. 2018-04-23 现行
I.S. EN 13476-2:2018 Plastics Piping Systems for Non-pressure Underground Drainage and Sewerage - Structured-wall Piping Systems of Unplasticized Poly (vinylchloride) (pvc-u), Polypropylene (pp) and Polyethylene (pe) Part 2: Specifications for Pipes and Fittings With Smooth Internal and External Surface and the System, Type a National S.. 2018-04-23 现行
I.S. EN 13476-3:2018 Plastics Piping Systems for Non-pressure Underground Drainage and Sewerage - Structured-wall Piping Systems of Unplasticized Poly (vinyl Chloride) (pvc-u), Polypropylene (pp) and Polyethylene (pe) Part 3: Specifications for Pipes and Fittings With Smooth Internal and Profiled External Surface and the System, Type b National S.. 2018-04-23 现行
I.S. EN ISO 11296-1:2018 Plastics Piping Systems for Renovation of Underground Non-pressure Drainage and Sewerage Networks Part 1: General (iso 11296-1:2018) National S.. 2018-04-10 现行
ASTM C1802-18 Standard Specification for Design, Testing, Manufacture, Selection, and Installation of Fabricated Metal Access Hatches for Utility, Water, and Wastewater Structures American S.. 2018-04-01 现行
I.S. EN ISO 11296-4:2018 Plastics Piping Systems for Renovation of Underground Non-pressure Drainage and Sewerage Networks Part 4: Lining With Cured-in-place Pipes (iso 11296-4:2018) National S.. 2018-03-05 现行
I.S. EN ISO 11297-2:2018 Plastics Piping Systems for Renovation of Underground Drainage and Sewerage Networks Under Pressure Part 2: Lining With Continuous Pipes (iso 11297-2:2018) National S.. 2018-03-04 现行
I.S. EN ISO 11297-4:2018 Plastics Piping Systems for Renovation of Underground Drainage and Sewerage Networks Under Pressure Part 4: Lining With Cured-in-place Pipes (iso 11297-4:2018) National S.. 2018-03-04 现行
I.S. EN ISO 11296-2:2018 Plastics Piping Systems for Renovation of Underground Non-pressure Drainage and Sewerage Networks Part 2: Lining With Continuous Pipes (iso 11296-2:2018) National S.. 2018-03-04 现行
ISO 11297-1:2018 Plastics piping systems for renovation of underground drainage and sewerage networks under pressure Part 1: General Internatio.. 2018-02-26 现行
ISO 11296-1:2018 Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks Part 1: General Internatio.. 2018-02-16 现行
I.S. EN 1852-1:2018 Plastics Piping Systems for Non-pressure Underground Drainage and Sewerage - Polypropylene (pp) Part 1: Specifications for Pipes, Fittings and the System National S.. 2018-01-28 现行
ISO 11296-4:2018 Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks Part 4: Lining with cured-in-place pipes Internatio.. 2018-01-25 现行
ISO 11297-2:2018 Plastics piping systems for renovation of underground drainage and sewerage networks under pressure Part 2: Lining with continuous pipes Internatio.. 2018-01-24 现行
ISO 11296-2:2018 Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks Part 2: Lining with continuous pipes Internatio.. 2018-01-24 现行
ISO 11297-4:2018 Plastics piping systems for renovation of underground drainage and sewerage networks under pressure Part 4: Lining with cured-in-place pipes Internatio.. 2018-01-11 现行
ASTM F3080-17a Standard Practice for Laser Technologies for Measurement of Cross-Sectional Shape of Pipeline and Conduit by Non-Rotating Laser Projector and CCTV Camera System American S.. 2017-12-01 现行
cacheName: