
Electrical Safety In Low Voltage Distribution Systems Up To 1 Kv A.c. And 1,5 Kv D.c. - Equipment For Testing, Measuring Or Monitoring Of Protective Measures - Part 7: Phase Sequence
出版:Swiss Standards

专家解读视频
Defines the requirements for measurement of equipment applied to testing the phase sequence in three-phase distribution systems. The phase sequence may be indicated by mechanical, visual and/or audible means. Not applicable to ancillary measuring equipment for other quantities, such as voltage testers consisting of an additional phase sequence indicator. Not applicable to monitoring relays.
DIN EN 61557-7 (1998-05) - Identical
BS EN 61557-7:2007 - Identical
DIN EN 61557-7 (2008-02) - Identical
UNE EN 61557-7:2007 - Identical
SS EN 61557-7 Ed. 2 (2007) - Identical
I.S. EN 61557-7:2007 - Identical
NF EN 61557-7:2007 - Identical
NBN EN 61557-7:2007 - Identical
IEC 61557-7 Ed. 2.0 - Identical
DIN EN 61557-7:2008 - Identical
NF EN 61557-7 : 2007 - Identical
DIN EN 61557-7 : 2008 - Identical
NBN EN 61557-7 : 2007 - Identical
IEC 61557-7 : 2.0 - Identical
I.S. EN 61557-7:2007 - Identical
EN 61557-7 : 2007 - Identical
UNE EN 61557-7 : 2007 - Identical
BS EN 61557-7 : 2007 - Identical
UNE EN 61557-7 : 2007 - Identical
NF EN 61557-7 : 2007 - Identical
NBN EN 61557-7 : 2007 - Identical
BS EN 61557-7 : 2007 - Identical
I.S. EN 61557-7:2007 - Identical