
Execution Of Special Geotechnical Works - Displacement Piles
出版:Standardiserings-Kommissionen I Sverige

专家解读视频
Sets up general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration.
UNE EN 12699:2016 - Identical
NEN EN 12699:2015 - Identical
NS EN 12699:2000 - Identical
UNE EN 12699:2001 - Identical
ONORM EN 12699:2001 - Identical
SN EN 12699:2001 - Identical
NEN EN 12699:2001 - Identical
NF EN 12699:2001 - Identical
NBN EN 12699:2001 - Identical
UNI EN 12699:2002 - Identical
NS EN 12699 Ed. 1 (2001) - Identical
DIN EN 12699 (2001-05) - Identical
I.S. EN 12699:2015 - Identical
BS EN 12699:2015 - Identical